An N-Scale Santa Fe branchline through the mountains

Project Oil Refinery Projects / Home
Manufacturer Custom


07/04/2023 - Part 12 - Refinery - A ladder and more walkways
07/02/2023 - Part 11 - Refinery - Some basic scenery and walkways
11/07/2020 - Part 11 - Refinery - Installed pipeing to/from distillation tower
11/01/2020 - Part 10 - Refinery - Completed the distillation tower
10/04/2020 - Part 9 - Refinery - More work on the distillation tower
09/27/2020 - Part 8 - Refinery - Started on the distillation tower
09/19/2020 - Part 7 - Refinery - piped the main oil tanks
09/12/2020 - Part 6 - Refinery - Added Desalter and Oil tanks - started piping
09/07/2020 - Part 5 - Refinery - Finished the coal bins and the furnances
08/30/2020 - Part 4 - Refinery - Finished the loading dock/shed and started the coal bins
08/22/2020 - Part 3 - Refinery - Finished the office building
08/16/2020 - Part 2 - Refinery - Fill, sand and prime the tanks, started the office building
08/09/2020 - Part 1 - Refinery - Starting work on a small 1930's refinery

08/09/2020 Top

Part 1 - Refinery
Starting work on a small town refinery from the 1930's - geared toward predominately heating oil, propane and gasoline. Drew up the layout for the plant, then cut-down and cleaned up several different sizes of pill bottles to represent the different tanks. Marked and cut panels into the tanks.









Next up is to fill-in and smooth the tops, then paint the tanks black. I am also working on the dock and office building.


08/16/2020 Top

Part 2 - Refinery
Continued work on a small town refinery. Filled, sanded and primed the tanks. Makes it obvious that a 2nd round of filling/sanding is required. Started the Distilling and Cracking Towers, which still need to be filled and sanded. Also started on the office building





After priming, any filling/sanding issues become very obvious





Next up is round 2 of filling, sanding and priming the tanks and towers, complete the dock and office building.


08/22/2020 Top

Part 3 - Refinery
Continued work on a small town refinery. Finished the office building, did more work on the dock/storage building (but no pics)





Next up complete the dock and storage building. More filling/sanding on the tanks and towers, then a final primer coat


08/30/2020 Top

Part 4 - Refinery
Continued work on a small town refinery. Finished the loading dock/shed and started work on the coal bins







Next up complete the coal bins. Start the heaters. More filling/sanding on the tanks and towers, then a final primer coat


09/07/2020 Top

Part 5 - Refinery
Continued work on a small town refinery. Finished the coal bins and the furnaces.





Next up start adding the details to the various storage tanks


09/12/2020 Top

Part 6 - Refinery
Continued work on a small town refinery. Added the Desalting tank and the source Oil Tanks, a few figures, and started work on the piping.





This view shows a pump unit, a T-section, a valve and then a 90 degree up to the top of the tank.



Next up continue work on piping to/from the source oil tanks - then on to the Distilling & Cracking towers


09/19/2020 Top

Part 7 - Refinery
Continued work on a small town refinery. Did the piping for the main oil tanks.
Sorry about the poor photos, it was hard to get the camera in a good angle without blocking the lighting









Next up the Distilling & Cracking towers


09/27/2020 Top

Part 8 - Refinery
Continued work on a small town refinery. Started on the Distillation tower



Next up, finish the piping on the Distillation tower & start the Cracking tower


10/04/2020 Top

Part 9 - Refinery
Continued work on a small town refinery. Added access hatches and more walkways on the Distillation tower



Next up, finish the piping on the Distillation tower & start the Cracking tower


11/01/2020 Top

Part 10 - Refinery
Continued work on a small town refinery. Finally completed the Distillation tower. The catwalks took forever, mostly because my big, clumsy fingers kept breaking off sections I had already completed.







Then I realized none of the catwalks had any supports, so I went back and added those



Did not notice until I posted this picture that I had knocked over one of the light posts
Next up, add the piping to/from the Distillation tower & start the Cracking tower


11/07/2020 Top

Part 11 - Refinery
Continued work on a small town refinery. Installed piping to/from Distillation tower.





Next up, start the Cracking tower


07/02/2023 Top

Part 11 - Refinery - Basic Scenery and Walkways
Dusted off the Refinery project. I added basic scenery and more grime on the tanks.



Then I added some walkways.





07/04/2023 Top

Part 12 - Refinery - Ladder and a wood walkway to the ladder
Added a ladder, walk-overs and another walkway.



Unfortunately, the refinery has to go back on the back-burner again.
I can't find the hole-punch needed for the access hatches on the cracking tower.


Top